KIT-RSPb Installation Guide Version 1.4 Auber Instruments, 730 Culworth Manor, Alpharetta, GA 30022 e-mail: [email protected] Tel: 770-569-842
Figure 17. Connection of the cables to SSR 2) There are two thermostats on top of the boiler as shown in Figure 18. The blue arrow points to the bre
black cables from the SSR output are connected to the cables that originally were on the steam control thermostat. Figure 19. SSR output connections
Figure 20. Tied up the cables 5) Install the controller box grounding wire to the boiler. There are two green colored grounding wires installed on
Figure 21. Install the controller box grounding wire to the boiler. Red arrow shows its position 6) Reinstall the protecting panel for the pump and
Figure 22a. Red arrow shows the RTD sensor installed in the bracket that was for the brew thermostat. The cable to the heater has been removed for ea
in Figure 23b. The tab on the piggyback connector should be on the top. You need to bend it downward a little bit if the angle is too high. It is very
Figure 23c. Put the original power cables back. 3) Install brew pump control cable. Remove the white colored cable from brew switch. Connect the gr
Figure. 24. Red arrow shows where the white cable has been removed. Green arrow shows the cable is connected to the green colored pump c
Figure 25. Cables going through the back panel of the controller box. 3) Fit all cables through the rubber grommet on the back panel of the control
4) Wiring the controller correctly is a very critical step. Failure to install it correctly can cause damage to the machine and electric shock. The t
Figure 2. Dual Solid State Relay (SSR), mounting screw, nut and washer. The dual SSR in the kit contains two SSRs in one package. The left side will
Figure 27b. Bend the wire for easier insertion. 5) Install a cable tie as strain relief. Place a cable tie at 1.5 to 2 inches away from the back of
the rubber grommet is on the upper left corner (viewing from back). Mount the controller box ground wire to the lower left screw as shown in Figure 29
shown on Figure 31. It is for reducing the heat transfer to the controller. The front panel of the controller box should be flush with the machine fro
10) Before re-installing the top cover, cut the excess tail of the cable ties. Check all connections that have been changed. Make sure that there are
To use the machine, please read “Operation manual for Rancilio Kit”. 24
Appendix 1) Circuit diagram of Silvia. 25
2) Circuit diagram of Silvia with the KIT-RSPa connection 26
Figure 4. Pair of black cables for connecting SSR output to the cables that used to be on the steam thermostat. They are terminated with fem
Figure 6. Cables for connecting controller steam control output to SSR steam control input. Red cable is for positive. Blue cable is f
Figure 9. Cable ties Figure 10. Brew pump control cable. Green Figure 11. Left, silicone heat transfer compound (white paste in the vial) for S
Figure 12. Controller box ground wire. Green Procedure A. Preparation for installation. 1) Disconnect the power cord from power outlet. Remove t
Figure 14a. Red arrow indicates the screw that hold back panel. Figure 14b. The screw on the bottom of machine that holds the back panel (Red arrow)
Figure 15. Screws that hold the protecting panel for the pump. 3) Mounting the SSR on the first hole from left. Apply small amount of thermal con
Figure 16b. Bottom view of the SSR mounting screw. C. Connecting SSR Cables and Grounding Wire. 1) Connecting the cables to SSR as shown in Figur
Komentáře k této Příručce